I know it has been a while. I have kind of stalled out on projects. Not that there aren't tons to be done, but just that with working full time, I find that I am limited on time.
The way that this corner of our living room was set up (even though it wasn't completely set up) has been bugging me for a while, but I haven't had the time or inclination to do anything about it. Well, the other day, this changed...I decided it was time to just try it out. It gave me the opportunity to get some cleaning done in the same part of the room.
So here it is.
This is the before picture. I had the love seat kind of up against the wall, with the step tansu against the stair railing but set up as a buffet and not in the step configuration. I didn't like how the love seat bled over in front of the window and how I couldn't put it all the way up against the wall because of the task light and the heater vent.
So this is now it looks now...
I put the step tansu in the corner set up in the step configuration and added some art to the wall. I moved the love seat in front of the step railing. I think it flows a lot better and makes the whole area more functional. I guess someday I'll be done with the rest of the house...of course this will probably be ten minutes before we sell it...lol.
Tuesday, January 26, 2016
Thursday, October 1, 2015
Dishwasher Door Gasket
On the project list....I think the steak knives have have scrapping a spot of the gasket.
Thankfully there is no leakage yet, but this needs to be taken care of, and soon.
Just one more of those small little tasks that needs to be taken care of and take up room on the To Do list....grrr
Thankfully there is no leakage yet, but this needs to be taken care of, and soon.
Just one more of those small little tasks that needs to be taken care of and take up room on the To Do list....grrr
Saturday, July 25, 2015
Stair Cleanup
This is one of those tasks that has to be repeatedly done around here, but always is kind of gratifying because it is such a stark change.
I probably shouldn't let it set for so long before tackling it each time but time gets away from me pretty quickly.
The St John's Wort is nice to have for the greenery and the erosion control, but it can be a bit evasive at times and you have to stay on top of it or the stairs completely disappear.
The fence in the background needs some work. I hope to get it fixed this spring when it gets warm enough to set cement for the new posts.
Thursday, July 16, 2015
And It Is Done
At this point, it wasn't full yet, just getting to the shallow end...took forever to get the water up to the right level where we would turn off the vacuums that are sucking the liner to the sides until it fills up enough to stay put.
You can see how dark the new bottom is but it makes the water so much more blue and quite lovely.
Just about there...only a few more inches to go but they still take forever even with two hoses running.
Finally full, the water looks so much better. Can't wait for it to be balanced and ready for swimming!!
You can see how dark the new bottom is but it makes the water so much more blue and quite lovely.
Just about there...only a few more inches to go but they still take forever even with two hoses running.
Finally full, the water looks so much better. Can't wait for it to be balanced and ready for swimming!!
Monday, July 13, 2015
The Bamboo Lagoon Project Continues
So the pool was empty but then we got some rain and it filled up the bottom a bit. I wasn't sure if I should run the pumps more with the water so low so I held off.
You can see all the different tears but these happened after it was empty from the pull of the liner and the fact that it was dry in the sun.
Doesn't even look that big when the liner isn't pressed into the sides from the water. I can't wait to see the new look and have the pool clean and usable again.
Subscribe to:
Posts (Atom)