In the course of this, I have a lot of supplies and several half accomplished projects (along with many unstarted projects) and thought I better make a list. This is just a list of the ones I have already got supplies for, not all projects which need to be done around here (which would make for a very big post).
Update: as I remember items, I have been adding them to the list, and as I have been finishing things off, I am striking them out. Having this list is actually a really good thing for me...not sure why I didn't do it before.
Replacing all four porch lightsAug 4Fixing 220 outlet in laundry roomJan 10Setting up remote garage door openerApr 13Create new screens (frames and all) for downstairs bedroomsJune 7Set up weight roomJuly 21- Weedblock bed
Reinstalled downstairs blindsJuly 21Put table togetherJuly 21- Fixing redwood bench on pool deck
Check insulation situation in atticSept 7Changing lock on downstairs closet doorSept 20- Painting white lattice under pool deck
- Painting all bedrooms, bathrooms, hallways and the laundry room
Fixing electrical outlet on pool deckMarch 25Fixing electrical in garageOctober 25Fixing electrical in houseMarch 25Replacing lights in two bedroomsJanuary 3- Replacing exhaust fan in office with light
Mulching bedsMarch 30Replacing porchAugust 30Changing curtain rods in livingroomMarch 21- Planting items in yard
Getting rid of gophers- Redoing side beds and border
- Removing dead stuff from yard
- Removing overgrown stuff from yard
- Cleaning grout in kitchen
- Fixing grout along kitchen backsplash
- Reseeding grass
Fixing fence on right side of houseApr 13- Fixing fence on right side of house
Fixing closet in bedroomOct 13Patchingand retexturing holes in walls- Sanding and staining railing
- Sanding and staining window seat
- Pruning plants in backyard
- Touching up exterior paint
- Caulking kitchen sink and
around faucets in tubJuly 22 - Cleaning and painting table for pool deck
- Labeling all plants in yard
Painting exhaust fan covers, doorbell cover and intake vent coversJuly 22Replacing towel racks and toilet paper dispensers in both bathroomsMarch 23- Prepping and painting all stained doors and trim white
Installing CO2/smoke alarm downstairsApril 24Change filters on heating/cooling systemJuly 15- Change out electrical 220 in garage
- Tiling laundry room
- Tiling mbath
- Tiling downstairs bath
- Installing vanity
Installing Magic MeshMarch 12Install new vanity lights in mbathAugust 24- Install new vanity lights in downstairs bath
Replacing sand filter and multi-port valueJune 23Install storage for extension ladderApril 13New herbsJune 15New plants in potsJune 15- Fix rock wall near pumphouse
Fix support in weight room closetOct 13- Fix rock wall in guest parking area
- Create manual sprinklers for side yard
- Create manual sprinklers for lower back yard
- Work on pool deck boards
- Install reducers on the drip lines
- Installing new mirrors
Moving old mirror from mbathSept 20Fix electric box cover in laundry roomSept 7Insulate attic opening coverSept 7Secured dryer ventSept 7Fix hole from woodpeckerSept 20Install new cabinets in laundry roomSept 20Unpacking 12000+ lbs of household goodsMarch 10Installing bamboo floors on main floor of houseOct 13- Install ceiling fan
Caulking and filling all baseboards on main floorMar 11Filling floor in kitchenJun 9Patching poolFeb 20Replacing pool linerJuly 16- Powerwash patio furniture
- Powerwash driveway
Fixing drain in bathtubNov 20- Putting new trim pieces on faucets
- Fix porch stairs
- Fix sprinkler problems
- Fixing fence posts on left side of house
Demo cabinet in garageMar 25Replace shower doorMay 3Patch and paint touch up on stair wallsMay 4