I have mentioned before that we had a substantial amount of water damage done to the house by the totally slacking property management company last year. I do realize that I have yet to actually post about that event but I have mentioned it in a few posts that I have put up here.
Anyhow, the downstairs bathroom was one of the most damaged parts of the house and is the only guest bathroom in the house. We lost the floor, several walls, 1/2 of the ceiling, insulation, and a huge 95 inch vanity that ran the length of one wall. We reinstalled the insulation and had the drywall and texturing done right away but paint, floors and vanity have been on the To Do list for some time.
Second little bug that got tackled was the painting of several covers around the house. Two of the exhaust van covers that can't be replaced with new, the doorbell cover and the intake vent cover all needed to be painted white and put back into place so there wouldn't be any gaping holes around the house. It took a couple of coats of spray paint to get all of the tan to white but they look much better now installed where they are supposed to be.
No comments:
Post a Comment